LE BOURGET STATION
2015 , LE BOURGET - FRANCE
PROGRAMME: RER STATION - GRAND PARIS
STATUS: IN PROGRESS
CLIENT: SOCIETE DU GRAND PARIS
SURFACE: 3.800 m²
COST: 21.400.000 €
TEAM: SWECO - ATELIER NOVEMBRE - MENOMENOPIU DESIGN
The station is designed on different levels inside a compact and optimized volume. The circulation on the inside is entirely mechanic. The main access is a common point of double height. The passenger’s space, the entrance, the information point the shops etc. are located after the first underground level S1. The building is designed with a tridimensional steel structure and a particular attention has been given to the materials (light and transparent) in order to have natural light throughout.